New CLV – NKT Eleonora

NKT Eleonora key facts:

  • Cable laying capacity: 23,000 tonnes on 3 turntables

  • Dimensions: Length 176 meters, breadth 32 meters

  • Schedule: Vessel is expected operational from 2027

  • Fuel: Dual fuel. Methanol and HVO/marine diesel oil

  • Engines: Wärtsilä 32 Methanol Engines 

  • Shipyard: VARD

  • Main suppliers: ABB (Onboard DC Grid power system and aft Azipod electrical propulsion), Wärtsilä (engine maker, front tunnel and azimuth thruster), NOV REMACUT (cable lay system, cranes and mission equipment)


https://www.nkt.com/news-press-releases/nkt-names-new-market-leading-cable-laying-vessel-able-to-run-on-methanol

 

For additional information, please contact

Managing Director
Andreas
Siglen
asi@saltship.com
+47 971 12 318